top of page

Manufacturing.

AI for the plant floor and the planning office: quality, throughput, and uptime, measured in units rather than slides.

The plant measures everything. Almost none of it decides anything.

Decades of sensors, MES logs, and quality records flow into historians and get looked at after the fact: in the morning meeting, in the monthly review, in the root-cause analysis weeks after the scrap was made.

​

We turn that record into decisions at line speed: defects predicted before the escape, failures flagged before the breakdown, schedules re-planned when the day changes. Built into the systems your plant already runs, and proven on the floor rather than in a pilot cell.

FOR PLANT LEADERS WHO

chase OEE with dashboards that trail the shift.

FOR LINES WITH

quality escapes caught at the end instead of the source.

FOR PLANNERS WHO

balance orders, changeovers, and maintenance by hand.

01 What we build here

AI that moves units, uptime, and yield.

Framed on your plant's numbers, built into MES, SCADA, and historians, and run shift after shift.

01

Predictive quality.

Defects predicted from process parameters upstream, so escapes are prevented at the source rather than caught at final inspection.

02

Predictive maintenance.

Failure signatures learned from your equipment's own history, with work orders raised before the breakdown instead of after it.

03

Planning & scheduling.

Schedules that absorb rush orders, changeovers, and maintenance windows, re-planned in minutes when the day stops cooperating.

04

Process optimization.

Setpoints tuned continuously against yield, energy, and scrap, within the limits your process engineers define.

05

Visual inspection.

Camera-based inspection trained on your defects and your surfaces, running at line speed with every judgment logged.

06

Shop-floor knowledge.

Procedures, troubleshooting guides, and the experience of your best operators made answerable at the line, before it retires.

02 The numbers we move

Every engagement is measured on  operational numbers.

Agreed before the build starts. Tracked in production. Reported without varnish.

OEE and unplanned downtime.

First-pass yield.

Scrap and rework.

Schedule adherence.

Energy per unit.

Escapes per million.

03 Work in this sector

CASE STUDY

Automating Supplier Document Processing

Automates the reading, matching, and validation of procurement and quality documents, keeping materials, payments, and production moving without delay.

Sector stories land here as they're cleared for publication.
Ask about the work →

One arc, in your operation.

The same Advise, Build, Run arc, applied to the plant: framed against your line's numbers, built into the MES, SCADA, and historians you already run, and operated shift after shift rather than handed off at the pilot.

01

Where Al pays on your floor

02

Inside MES, SCADA, and historians

03

Operated shift after shift

Bring us the lane, the warehouse, or the forecast that hurts.

Start a conversation
bottom of page